How Much Concrete Do I Need?

Common bed and slab sizes, answered directly.

Bagged concrete stops making sense somewhere around one cubic yard. Below that, bags are convenient; above it, a ready-mix delivery is cheaper and far less work. One cubic yard is 27 cubic feet, which is 45 bags of 80 lb — useful to know before you load a trolley.

Area Depth Area x Depth = Volume

By area at 4 inches deep

Area Cubic yards at 4 in Bags (0.6 cu ft) Weight
100 sq ft 1.3 cu yd 59 bags 2.6 tons
200 sq ft 2.59 cu yd 117 bags 5.2 tons
500 sq ft 6.48 cu yd 292 bags 13 tons
1,000 sq ft 12.96 cu yd 584 bags 25.9 tons
2,000 sq ft 25.93 cu yd 1,167 bags 51.9 tons

By depth, for 100 square feet

Depth changes the answer far more than most people expect. Doubling the depth doubles the quantity — the area stays the same.

Depth Cubic yards per 100 sq ft Bags (100 sq ft)
2 in 0.65 cu yd 30 bags
3 in 0.97 cu yd 44 bags
4 in 1.3 cu yd 59 bags
6 in 1.94 cu yd 88 bags

Worth knowing before you order

  • Four inches is standard for patios, walkways and shed floors. Driveways need five to six.
  • Order 5 to 10 percent extra. Running out mid-pour creates a cold joint you cannot hide.
  • If your total passes about 45 bags of 80 lb, price a ready-mix truck instead.

Need a size that is not in the table? Use the concrete calculator — it handles rectangles, circles, triangles and L-shapes, and switches between feet and metres.

Frequently asked questions

How much concrete do I need for 100 square feet?

At 4 inches deep, 100 square feet needs 1.3 cu yd — that is 59 bags at the 0.6 cu ft size, weighing about 2.6 tons.

How much concrete do I need for 1,000 square feet?

At 4 inches deep, 1,000 square feet needs 12.96 cu yd, which is 584 bags and roughly 25.9 tons.

How much concrete do I need for 2,000 square feet?

At 4 inches deep, 2,000 square feet needs 25.93 cu yd — 1,167 bags, about 51.9 tons. At that volume, bulk delivery is almost always cheaper than bags.

Should I order extra?

Yes — these figures already include a 5% allowance for uneven depth and edges. If your ground is very uneven, or the job involves several separate beds, round up one more step.